The graph below shows the effect on the Semi-Major Axis (SMA) of the Sumbandila orbit after the successful propulsion events.
28 January 2010
27 January 2010
Propulsion system commissioned
Sumbandila has a small (2.5l) Butane propulsion system which we have "fired" twice over the last couple of days: first for only 15s and the second time for 60s.
The telemetry of the second event can be seen below. The top trace (red) is the pressure in the propulsion tank. The second trace (purple) is the nozzle pressure. The green and yellow traces represent the temperature of the pipe leading to the nozzle (thruster) and the nozzle temperature respectively. Lastly the blue trace shows the pitch angle of the satellite, which has been maneuvered to 90° prior to the event in order to align the thruster with the satellite velocity vector.
The telemetry of the second event can be seen below. The top trace (red) is the pressure in the propulsion tank. The second trace (purple) is the nozzle pressure. The green and yellow traces represent the temperature of the pipe leading to the nozzle (thruster) and the nozzle temperature respectively. Lastly the blue trace shows the pitch angle of the satellite, which has been maneuvered to 90° prior to the event in order to align the thruster with the satellite velocity vector.
The image above shows the propulsion system being integrated into the satellite (bottom compartment).
Subscribe to:
Posts (Atom)
Current Keplerian Elements
Last Update: 1 Febr 2010
Element set: 404
Sumbandila 1 35870U 09049F 10032.48635300 .00000433 00000-0 21444-4 0 4040 2 35870 097.3525 084.8560 0011505 166.1189 300.7196 15.22856092 20818